Transformer Magazine Vol. 8 issue 2

TM Vol 8 issue 1 cover

Please log in to access the magazine.

Editorial Message

Dear colleagues,

The April issue of the magazine is in front of you. While thinking about whether there is something that makes this issue unique in relation to the previous issues, endless conversations I had with our authors and collaborators when preparing the materials for publication in recent weeks and months came to my mind. These working conversations about articles would often take a turn to a completely private sphere and, as I thought about them later on, I realised that many of us work in circumstances that are often very challenging on a personal level. I find it useful that, nowadays, we can do lots of things online, but these conversations have led me to conclude that everything has its limits. It is understandable that it is not at all easy to dwell exclusively in your home for a long period of time. However, while one would expect widespread apathy among people on such occasions, I got the impression that there has never been more optimism among us. I strongly believe that it is exactly this unbridled optimism, which has sprung in the midst of these challenging circumstances, and the zeal that could not have gone unnoticed while we were preparing the materials for this issue of Transformers Magazine, that have marked this edition. This optimism is exactly what I would like to convey to all our loyal readers through these written words.

Interview Ricardo_Suarez_Prolec

Interview with Ricardo Suarez, CEO of Prolec

Prolec transformers are designed and manufactured to the highest standards, combined with high quality materials and components, providing superior performance.

Transformer leak repair story from Polywater®

The fast and effective repair of power transformer oil or SF6 leaks is an important part of a consistent power supply that minimises economic losses for both power utilities and...

Transformer management system – TrafoGrade

The power distribution and industrial companies operate several thousands of medium and high-power transformers. Rationalisation of investment costs leads to optimization of the operation period of individual elements in the...